Most print records are written for the team. A review record has a different reader and a different job.
A print log kept for the crew answers what happened. A print log for a reviewer has to answer whether the wall in front of them was built within the envelope the system was qualified to. Those are different documents.
The three logs that have to correlate
Hardware
Calibration state, nozzle condition and pump pressure across the print, timestamped so it can be aligned with the others.
Environment
Wind velocity, ambient moisture and mix temperature, sampled frequently enough to show variation across a long print rather than once at the start.
Execution against intent
Actual layer timing compared to the digital timeline. This is the audit that turns an assumption about open time into a measurement.
References
Standards, code provisions and peer-reviewed work this article rests on. Designations are given in full so a reviewer can pull the source themselves.
ISO/ASTM 52939:2023Standard
The process standard: qualification principles, traceability and operational parameters for an additive construction site.
ICC-ES AC509Standard
Acceptance Criteria for 3D Automated Construction Technology for 3D Concrete Walls
The product-side criteria: wall properties, fire resistance and structural testing, plus the quality documentation an evaluation requires.
Buswell et al. (2018)Peer-reviewed
3D printing using concrete extrusion: A roadmap for research
Frames the relationship between material behaviour, process control and the geometry you actually get.
Citing a standard is not the same as certifying compliance with it. Nothing here is engineering certification, legal advice or a code approval.