A robotic gantry printing a concrete wall on an active construction site.

Expertise as a Service

3DCP Consulting Network.

We are a vetted global bench of digital robotic, 3D concrete printing (3DCP) and regulatory permitting experts. We provide advanced technical expertise, oversight and permitting support through one point of contact.

The gap

When a print fails you have hours, not weeks.

Robotic 3D concrete printing does not fail in a vacuum. It fails at the complex convergence of AI-controlled robotics, mechanical kinematics, digital-slicing technology and printing concrete chemistry. When an automated jobsite stalls you have limited time to diagnose the problem and few local deep tech resources to turn to for solutions.

This network was built to close that gap.

A 3D printed concrete wall with a failed, spalling interlayer joint between beads.

Three ways we support your operation

Pick the one that matches your needs.

A strike team inspecting a printed concrete panel on a stalled jobsite.01

Technical 3DCP Triage

A wall fails, a pump flashes mid-print, or your operator walks and nobody left knows your proprietary system. We mobilize a strike team from the global network, find the cause, and hand your team leader a solution matrix.

How triage works
An assigned expert bench meeting the site crew beside a live printing gantry.02

Dedicated On-Call Oversight

For teams who would rather not wait for the failure. An assigned bench of rheologists, structural engineers and field operators sits behind your project from aggregate batching through to a permitted, printed structure.

How oversight works
A building official and engineers reviewing a permit application submittal on screen, code volumes stacked on the desk.03

Regulatory and Permitting

Mapping your hardware, mix chemistry and wall design to the criteria a building official applies, so they have what they need to approve it. IBC 104.11, ICC-ES AC509, ICC 1150

How permitting support works

Response

How fast, in plain terms.

Level 1Immediate Triage
2 to 4 hours

Typical useActive jobsite stoppage, print halted

Level 2Express Advisory
24 hours

Typical useProblem contained, decision needed

Level 3Standard
48 to 72 hours

Typical usePlanned review, permitting, forensic work

Target response times. The Operational Control Center operates across all global time zones.

The bench

Four disciplines, one point of contact.

Two materials scientists reviewing a rheology curve beside mix samples and a two-component dosing rig.

Materials Scientists and Rheologists

Many hold PhDs. They work on 2K rapid-setting mortar accelerators and local aggregate optimization.

Engineers examining a printed lattice column at a gantry printer, a thermal simulation on the screen behind them.

Robotic Engineers and Slicer Developers

They understand the precision boundaries of multi-axis printers and can read the data a machine generates from its own self-correction loops.

Two site superintendents reviewing a tablet in front of a live gantry printing a concrete wall.

Field Operators and Superintendents

Hundreds of hours of live concrete wall printing between them.

Officials and engineers reviewing plan sets at a Building and Safety permit counter.

Code Officials and Certification Experts

Deeply invested in the permitting of printed structures, and fluent in how the governing criteria interact.

One intake reaches all four disciplines. We sort your issues and assemble the right expert team to quickly resolve them.

Meet the network

Mission

Make the knowledge accessible.

The people who built this sector are a small group, and most of what they know has never been written down. Our mission is to tap into the wisdom and expertise of the founders, robotic and structural engineers, slicer developers, materials scientists, rheologists, field operators, superintendents and code officials driving digital robotic construction, and to make their collective body of knowledge accessible to the next generation of builders entering the automated construction era.

Read the full mission

Start here

Tell us what stopped.

Intake takes a few minutes. You describe the project, the hardware, the mix and what went wrong. The Operational Control Center categorizes it, runs a conflict check and puts the right people on it.